Two bedroom apartment in a complex with unique architecture
Description of the object
On the east side of Turkey's most famous Mediterranean resort – Antalya – located a new promising area - Altyntash. Only the most modern and luxurious residential complexes are being built in Altintash, which will soon make this place a new center of luxury. In addition, new property in Altintash is a fantastic investment opportunity due to its proximity to the airport and the beaches of Lara.
At 7 km from the picturesque beaches, a residential complex unique in its design and architecture is being built. The complex will consist of two 5-storey blocks with 56 apartments of different layouts. The complex has many well-distributed social zones.
For the comfort of the residents of the complex, a transfer will be provided (airport - beach - center).
Apartment types:
- Apartments 1+1 with an area of 58–90 m².
- Apartments 2+1 with an area of 100–130 m².
- Penthouse 3+1 with an area of 150 m².
We bring to your attention an apartment with a demanded layout 2+1 with an area of 100–130 m². The layout includes: living room with American kitchen (27 m²), 2 bedrooms (9.5–14 m²), bathroom (4 m²), balcony (4 m²).
Apartments located on the ground floor have direct access to the garden with their own seating area.
Upon completion of the construction, the apartments are rented out with a full fine finish. During the construction, high quality materials are used: ceramic and laminate flooring, soundproof and heat-insulating windows, high-quality interior doors and a steel front door. The kitchen area is fully equipped with cabinet furniture and marble countertops. The bathroom is equipped with sanitary ware, a shower cabin and lockers are installed. The apartment will have a satellite TV system.
The excellent location of the complex, combined with the high quality of construction using the latest technologies and modern materials, as well as a well-thought-out public area, will provide future apartment owners with the most comfortable lifestyle.
Completion date: May 2024