Duplex penthouse with separate kitchen, Kestel
Description of the object
Just 150 meters from the turquoise sea, in the Kestel district of Alanya, a new residential complex is being built, in which we present to your attention a two-level apartment (duplex/penthouse) 4+1 layout with separate kitchen.
The Kestel area is famous for its environmental friendliness and comfort. The complex will offer views of the sea and the Taurus Mountains full of Mediterranean wonders.
The project will be located on the territory of 1,900 m² as part of one five-story residential block with 20 apartments. The two lower floors are occupied by commercial real estate.
The choice is represented by apartments of the following layouts:
- 1+1
- 2+1
- Duplex 2+1
- Duplex 3+1
- Duplex 4+1
All premises are provided with high-quality finishing, built-in plumbing and a comfortable kitchen set.
A wonderful and promising project for investment in the Kestel area. Ready-made apartments can be used both for your own permanent residence or recreation, and for renting out for any period.
The territory will be decorated with decorative green spaces and a well-kept garden.
General characteristics:
- Outdoor adult and children's pools
- Pavilions for relaxation
- Fitness room
- Sauna
- Internet in the public area
- Generator
Security system:
- Fenced and guarded area
- 24/7 video surveillance
- Watcher
Specification:
- Gypsum plaster interior walls, decorative suspended ceilings
- Ceramic and marble flooring
- Double walls with sound and heat insulation
- Interior doors
- Armored entry doors
- Double glazed PVC windows
- Internet and central satellite system
- Special exterior wall finishes
Kitchen:
- Built-in kitchen set with granite top
- Ceramic flooring
Bathroom:
- Wall and floor ceramics
- The bathrooms have built-in furniture, a washbasin, a wall-hung toilet, a shower room
- Boiler installed
Balcony:
- Aluminum railings and glass partitions
- Ceramic floors
- Outdoor lighting
Start and end of construction:
Project opened on 03/25/2021.
Scheduled to be completed on 04/30/2022.