Duplex apartment overlooking the pool and city environment
Description of the object
Surrounded by the picturesque nature of the ecologically clean city of Gazipasa on a land plot of 3633 m² construction of a luxurious complex with a unique design has started.
The complex will consist of two 4-storey blocks, including 80 apartments.
On its territory there will be located: a lobby, a fitness room, a sauna, a hammam, a steam room, a salt room, massage rooms, an indoor pool, a pool bar, a games room, a conference room, a business meeting room, a children's playroom, cafe/restaurant, outdoor swimming pool, children's pool, water slide towers, water park, artificial waterfall, BBQ area, garden.
Within walking distance from the complex, the entire developed infrastructure of the city is concentrated: restaurants, markets, markets, shopping centers, pharmacies, parks.
Apartment types:
- Apartments 1+1 with an area of 59 m².
- Apartments 2+1 with an area of 90 m².
- Penthouse 2+1 with an area of 140 m².
- Penthouse 3+1 with an area of 180–200 m².
We bring to your attention two-level 3+1 apartments located on the top floor and roof of the complex. The area of the apartments is 180–200 m². The layout includes: living room with American kitchen (28.65–35.80 m²), 3 bedrooms (11.80–21.65 m²), hall (2.10–10.40 m²), 3 bathrooms (3.75–5.30 m²), balcony (6.60 m²), 3 terraces (5.10–12.50 m²).
Upon completion of the construction, the apartments are rented out with a full fine finish. During the construction, high quality materials are used: ceramic and laminate flooring, soundproof and heat-insulating windows, high-quality interior doors and a steel front door. The kitchen area is fully equipped with cabinet furniture and marble countertops. The bathroom is equipped with sanitary ware, a shower cabin and lockers are installed. The apartment will have a satellite TV system.
The excellent location of the complex, combined with the high quality of construction using the latest technologies and modern materials, as well as a well-thought-out public area, will provide future apartment owners with the most comfortable lifestyle.
Construction timeline: March 2023 – December 2024