Comfortable apartment in the most desired location
Description of the object
In the heart of Alanya, just 450 meters from the famous Cleopatra Beach, the construction of a new stylish complex with a wide variety of infrastructure will soon begin. It will consist of two five-storey blocks with 42 apartments. The total area of the plot is 2 746 m². Residents of the complex will have access to: a lobby, a recreation room with table tennis, a fitness room, a children's playroom, a sauna, a steam room, a jacuzzi, a massage room, an outdoor pool for adults and children, water slides, a pool bar, gazebos and a barbecue area, children's playground, garden, outdoor parking for cars and bicycles.
Within walking distance from the complex are: chain stores Migros, Carrefour, A101 and Bim, as well as a beautiful promenade, a park, tennis courts, many playgrounds, cafes and restaurants.
Apartment types:
- Apartments 1+1 with an area of 67.5 m².
- Apartments 2+1 with an area of 80–81.6 m².
- Penthouse 2+1 with an area of 126 m².
- Penthouse 4+1 with an area of 212 m².
We bring to your attention an apartment with a demanded layout 2+1 with an area of 80–81.6 m². The layout includes: living room with American kitchen (26 m²), 2 bedrooms (11–13 m²), hall (3 m²), bathroom (4 m²), balcony (4.40–8 m²).< /p>
Upon completion of the construction, the apartments are rented out with a full fine finish. During the construction, high quality materials are used: ceramic and laminate flooring, soundproof and heat-insulating windows, high-quality interior doors and a steel front door. The kitchen area is fully equipped with cabinet furniture and marble countertops. The bathroom is equipped with sanitary ware, a shower cabin and lockers are installed. The apartment will have a satellite TV system.
The excellent location of the complex, combined with the high quality of construction using the latest technologies and modern materials, as well as a well-thought-out public area, will provide future apartment owners with the most comfortable lifestyle.
Construction timeline: December 2022 – June 2024